Client:
BBTP
Scope of Work:
Injection and strengthening of the cracked cap beam of the Bizerte Mobile Bridge. These works are part of the repair project for certain reinforced concrete structures of the bridge and access structures, following the observation of cracks on the underside of the cap beam of pier P3.
Work Completed:
- Crack Injection:
- Injection of cracks over a length of 15 ml to restore structural integrity.
- Slab Strengthening:
- Strengthening of the cap beam slab with 230 ml of carbon fiber laminates.